In 2016, France launched the E+C- pilot, testing methods for energy-positive and carbon-reduced buildings. The results shaped RE2020, which has been legally binding since January 2022.
RE2020 goes further than EU rules:
- Mandatory embodied carbon thresholds (Ic construction)
- Progressive energy performance targets (Ic énergie)
- Comfort rules to avoid overheating
By contrast, the EU’s revised Energy Performance of Buildings Directive (2024) requires disclosure of whole-life GWP for new buildings over 1,000 m² from 2028, and for all new buildings from 2030. Thresholds have not yet been set.
Want to go deeper? Read the full guide to RE2020, INIES and FDES.
France moved earlier and went further. With Emidat, you are ready for RE2020 through INIES while keeping EPDs aligned with the rest of Europe and upcoming CPR rules.